Production date 7/21
After full service (result: perfect conditions). No flight since then.
There is one small patch at the leading edge (see photo).
More photos (e.g. full service report) are available on request.
Posted by Shaker Kadhum 11 месяцев назад
Posted by Andrew Baird 1 год назад
Posted by Alexander Schmidt 1 год назад
Posted by Edan Perez 1 год назад