Production date 7/21
After full service (result: perfect conditions). No flight since then.
There is one small patch at the leading edge (see photo).
More photos (e.g. full service report) are available on request.
Posted by Shaker Kadhum il y a 11 mois
Posted by Andrew Baird il y a 1 an
Posted by Alexander Schmidt il y a 1 an
Posted by Edan Perez il y a 1 an