Production date 7/21
After full service (result: perfect conditions). No flight since then.
There is one small patch at the leading edge (see photo).
More photos (e.g. full service report) are available on request.
Posted by Neil Altice hace 9 meses
Posted by Shaker Kadhum hace 2 años
Posted by Andrew Baird hace 2 años
Posted by Alexander Schmidt hace 2 años
Posted by Edan Perez hace 2 años